DEG 2.06% $1.19 de grey mining limited

ASX ANNOUNCEMENT11 November 2021 Infill drilling being...

  1. 634 Posts.
    lightbulb Created with Sketch. 64
    ASX ANNOUNCEMENT11 November 2021 Infill drilling being undertaken within the proposed Brolga Stage 1 pit as a risk control exercise for early production. Proposed Brolga Stage 1 pit comprises 1.29Moz @ 1.3g/t Au of the overall JORC Mineral resource (23 June 2021) of 9.0Moz @ 1.2 g/t Au. New Infill Results* on section 30600E include: 80m @ 1.6g/t Au from 36m in HMRC204 93m @ 2.2g/t Au from 43m in HMRC205 127m @ 2.0g/t Au from 35m in HMRC206 (ends in mineralisation) 114m @ 1.5g/t Au from 126m in HMRC207 New Infill Results* on section 30440E include: 106m @ 1.0g/t Au from 42m in HERC676 107m @ 1.2g/t Au from 67m in HERC677 93m @ 1.6g/t Au from 81m HERC678 73m @ 1.2g/t Au from 144m in HERC698 New Infill Results* on section 30520E include: 54m @ 1.6g/t Au from 36m in HMRC212 53m @ 1.1g/t Au from 49m and 22m @ 1.9g/t Au from 124m in HMRC213 148m @ 1.0g/t Au from 44m in HMRC214 Infill drilling will continue as necessary during the PFS: to provide confidence across the priority early production sources; and to lift resource classification from JORC Inferred to Indicated at both Diucon and Eagle Exploration drilling continues across Greater Hemi and Regionally
 
watchlist Created with Sketch. Add DEG (ASX) to my watchlist
(20min delay)
Last
$1.19
Change
-0.025(2.06%)
Mkt cap ! $2.852B
Open High Low Value Volume
$1.20 $1.22 $1.19 $5.423M 4.522M

Buyers (Bids)

No. Vol. Price($)
4 45410 $1.19
 

Sellers (Offers)

Price($) Vol. No.
$1.20 1000 1
View Market Depth
Last trade - 16.10pm 25/07/2024 (20 minute delay) ?
DEG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.