ECT 16.7% 0.4¢ environmental clean technologies limited.

new information; In addition, VCPL?s Managing Director, Linh Vu...

  1. 1,205 Posts.
    lightbulb Created with Sketch. 89
    new information;

    In addition, VCPL?s Managing Director, Linh Vu Dac, has advised Arup that VCPL have employed
    a project engineer to commence 15 May 2011. The project engineer?s first action will be to
    undertake a final review of the scope of works proposed by Arup, with the intention to enter into the
    formal agreement with Arup, by 30 May 2011. While the intention was to sign the contract with
    Arup by 30 April, VCPL have decided to increase its own engineering capability to ensure it
    maximizes the output from Arup?s services and achieves maximum project benefits.

    This is a quality control play by Tincom. As big fees are required for detailed construction documentation the project engineer will confirm the scope of documentation in relation to thje fee submission provided by arup prior to formal engagement. The project engineer will be the project manager and needs to be unbiased with best interest in driving the project forward and getting it up on time. Good move, I would be very interested to know who this is, skills, creditials.

    gap closed created from open, good volume, was always going to be plenty of resistence along the way.
 
watchlist Created with Sketch. Add ECT (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.001(16.7%)
Mkt cap ! $11.10M
Open High Low Value Volume
0.3¢ 0.4¢ 0.3¢ $12 3.959K

Buyers (Bids)

No. Vol. Price($)
43 13856773 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 11661830 28
View Market Depth
Last trade - 14.57pm 28/06/2024 (20 minute delay) ?
ECT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.