NDO 2.92% 88.0¢ nido education limited

chart, page-74

  1. 6,349 Posts.
    lightbulb Created with Sketch. 100
    Checking the operators releases, no start dates have been given other than drill H1, first oil H2.

    The previous rig status report had a start date of late March to end job late June, with the 5yr survey moved into 2013. Looks like they've decided to do the survey prior to the Galoc drill.

    I note Ya gave us this info 5 days after the new rig status report was released.

    Still, a long wait for the SI's and ourselves without any other news flow.
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.