Sorry chaps but Tesla gigafactory is only just starting ramp up and is producing at peak 300 batteries a week. If Elon's timetable is met the factory needs to produce 5000 65 kW batteries per week. Demand for lithium, cobalt, graphite is gonna go ballistic over the next 6 months. At this time none of the other mines will even be operational.