The ann wasnt about the 1m of intersection it was about where they are planning to drill test holes in December. The meantion of the already drilled hole was a reference for location of the drilling program.
- Forums
- ASX - By Stock
- PNX
- Chart
Chart, page-76
-
- There are more pages in this discussion • 269 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PNX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PNX (ASX) Chart |
Day chart unavailable