BP8 0.00% 0.3¢ bph global ltd

It usually takes 3 to 6 months to form a cup and handle pattern...

  1. 564 Posts.
    It usually takes 3 to 6 months to form a cup and handle pattern or a suace pan pattern and the graph abive shows a classical attributes of the the pattern.
 
watchlist Created with Sketch. Add BP8 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.