There's a lot riding on this ann due any day for everybody. Then another 10-20 days waiting. GLTAH.
BRK has been in a Stage 1 breakout since 19/11.
We've had 2 mini-breakouts since.
First one (A) started on 03/03 with massive volume 400m ending 11/05.
Second one (B) started on 22/07 with small volume 37m and hasn't yet ended.
From 11/05 to 22/07 traders have been in accumulation mode with resistance at low 2.2 and high 2.6 forming a beautiful cup finishing on 02/08 with a daily high of 4.1
Now we are in handle territory, and BRK having a tiny qty of short sell (when I last looked), possibly the SP may dip it's toes into 2.8 for those trying to push, push the SP lower over next few days with the mini-me trades.
However, the fundamentalist cavalry are about to arrive in the form of ann, and if it's the positive outcome we are expecting, leaks and FOMO prior to this will see the SP bottom out rather promptly and swing up to form the handle we are all eager to see eventuate and at $100m m/c, institutional investors will start jumping in and this will really propel the BRK sp.
Thankyou.
- Forums
- ASX - By Stock
- Chart
There's a lot riding on this ann due any day for everybody. Then...
-
-
- There are more pages in this discussion • 1,250 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BRK (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
-0.001(4.55%) |
Mkt cap ! $50.11M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.0¢ | $23.05K | 2.183M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
44 | 25833994 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 54460586 | 48 |
Last trade - 13.57pm 15/10/2024 (20 minute delay) ? |
Featured News
BRK (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online