Apparently there are lots of references to all the “kit” we need to buy especially all the drill “bits” which are listed individually as well as the material each of the drill “bit” “tips” are made from. Then we have all the “tig” welding equipment and “tin” snips we need to finance.
Then we have all the references about what we need to “fit” into the open “pit” and date targets we need to “hit”.
We also have a lot of references of how long we have “till” we need to get it all done and “tic” all the boxes.
So as you can see lots of dotting and crossing. I’m trying not to get in a “tiz” over it....right I’m off “taxi”
- Forums
- ASX - By Stock
- Chart
Apparently there are lots of references to all the “kit” we need...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $56.46M |
Open | High | Low | Value | Volume |
3.7¢ | 3.7¢ | 3.5¢ | $29.91K | 825.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 77732 | 3.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.7¢ | 170421 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 77732 | 0.035 |
3 | 318409 | 0.033 |
3 | 1343780 | 0.032 |
1 | 5000 | 0.031 |
4 | 333300 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.037 | 170421 | 3 |
0.038 | 721845 | 3 |
0.039 | 640000 | 2 |
0.040 | 451062 | 2 |
0.041 | 377200 | 2 |
Last trade - 16.10pm 01/10/2024 (20 minute delay) ? |
Featured News
CYM (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online