1m plus oz on permitted ground with a built plant , power station, airstrip, proven metallurgy , plus glenburgh and yalgoo and a boatload of tax losses. And $50m in the bank, no hedging or other liabilities.
She’s a unicorn and should be priced on that basis.
- Forums
- ASX - By Stock
- Chart
1m plus oz on permitted ground with a built plant , power...
- There are more pages in this discussion • 167 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
68.8¢ |
Change
0.023(3.38%) |
Mkt cap ! $748.7M |
Open | High | Low | Value | Volume |
67.0¢ | 69.5¢ | 67.0¢ | $2.003M | 2.926M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 156742 | 68.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
69.0¢ | 35424 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 28588 | 0.690 |
11 | 78455 | 0.685 |
9 | 91071 | 0.680 |
9 | 92995 | 0.675 |
9 | 172576 | 0.670 |
Price($) | Vol. | No. |
---|---|---|
0.695 | 212844 | 13 |
0.700 | 593071 | 23 |
0.705 | 54558 | 5 |
0.710 | 42222 | 5 |
0.715 | 26620 | 2 |
Last trade - 12.21pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
69.0¢ |
  |
Change
0.023 ( 3.78 %) |
|||
Open | High | Low | Volume | ||
67.0¢ | 69.5¢ | 67.0¢ | 456639 | ||
Last updated 12.31pm 16/05/2024 ? |
Featured News
SPR (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online