Im having trouble understanding BCD's most recent drill results. On the drill results table its got the width (m) of the drill. Underneath the table it says "Widths shown are calculated horizontal widths".....what does this mean? How could it be horizontal? Isnt this supposed to be the depth of the actuall intersect as in virtical?
Also the intercept of J10 of 32.7g/t is at a depth of 1360m below surface. Thats a long way down. Is this going to pose any problems getting to it economically?
BCD Price at posting:
$1.58 Sentiment: Buy Disclosure: Not Held