LPD 33.3% 0.2¢ lepidico ltd

Then the expected results will help to grow! Operations •...

  1. 444 Posts.
    lightbulb Created with Sketch. 102
    Then the expected results will help to grow!

    Operations
    • Engineering for the Phase 1 L-Max® Plant Feasibility Study, conducted by Lycopodium,
    continues and is on track for completion by end December 2017. Permitting works have
    commenced and are scheduled for completion in the September 2018 quarter.
    • Resource definition drill program at the Alvarrões Lepidolite Mine in Portugal completed, with
    multiple mineralised pegmatite sills identified that exhibit significant down-dip continuity.
    Maiden JORC Code compliant resource estimate scheduled for December 2017 quarter.
    • Farm-in agreement signed to earn up to 75% of the lithium rights in the Moriarty Lithium
    Project from Maximus Resources. Field work to commence in December 2017 quarter.
 
watchlist Created with Sketch. Add LPD (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.