That depends...
Where will the ore go?
What depth is the base of oxidation? It was absent from the cross-section in the update announcement.
There looks to be some sort of constraint with the tenement boundary on the eastern side...the pit shape seems influenced by it. I can only assume ESR have no rights to that ground. Is this going to impact on final depth of pit etc?
Steep orebody, so need to move a fair amount of dirt to get deeper = High strip ratio.
Anything else in the ore like gold, platinum, palladium, copper?
Given they can probably just load dirt into road trains and off to the concentrator (yet to be named) then it is pretty cheap mining. ~$30-40/tonne? $5m to mine the 125,000t.
Need to factor in some dilution and losing a big chunk of metal in toll treatment charges.
- Forums
- ASX - By Stock
- ESR
- Cheapest Nickel producer on the ASX ( MC 22m )
Cheapest Nickel producer on the ASX ( MC 22m ), page-6
- There are more pages in this discussion • 583 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ESR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(9.09%) |
Mkt cap ! $8.797M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $144 | 28.88K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 5221179 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 3646026 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 5221179 | 0.005 |
21 | 14324086 | 0.004 |
16 | 10035986 | 0.003 |
10 | 9649980 | 0.002 |
9 | 17746489 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 3646026 | 8 |
0.007 | 4906000 | 6 |
0.008 | 4146891 | 8 |
0.009 | 569059 | 2 |
0.010 | 4194560 | 5 |
Last trade - 16.10pm 23/04/2024 (20 minute delay) ? |
|
|||||
Last
0.5¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.5¢ | 0.5¢ | 0.5¢ | 100000 | ||
Last updated 13.37pm 23/04/2024 ? |
Featured News
ESR (ASX) Chart |