GOP gippsland offshore petroleum limited

check out gop/gopo boys!, page-10

  1. 35,149 Posts.
    lightbulb Created with Sketch. 961
    Hi Gilbert was supposed to have been contracted and slotted to be drilled within 3 months from the prospectus date (2004 ) I am sure that it should be drilled after this well for BPT and Anzon is completed Cheers Towie
 
watchlist Created with Sketch. Add GOP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.