I believe that river/port system could cater for 10m t p/a using 10k t barges. Along with a 2:1 strip ratio mine, that could keep costs to $40p t.
Rail needs a 69km spur line. I have no idea what that would cost but could easily add another 10m t p/a if built.
I believe that river/port system could cater for 10m t p/a using...
Add to My Watchlist
What is My Watchlist?