    DECEMBER QUARTER PRODUCTION SUMMARY FOR
    3 MONTHS TO 31 DECEMBER 2005





    Last week, SMC Gold announced that a drilling programme to further extend and
    upgrade the resources at Cinabrio is scheduled to commence in the second week of February 2006.
    The objectives of the new drilling programme are to:
    _ Upgrade the Mineral Resource categories of the current resource in which
    approximately half are already in the higher Measured and Indicated Resource
    categories
    _ Provide information for detailed mine planning so that Resource categories can
    be upgraded to Reserve status
    _ Confirm the grades and continuation of mineralisation along strike and at depth
    It is expected that the new drilling programme will increase Resources and Reserves
    at Cinabrio which will strengthen the company’s asset base and balance sheet and
    consequently our ability to raise debt capital to pursue growth opportunities such as
    the plant expansion and copper oxide project.


    *********************************************************************


    Grinding Circuit
    The grinding circuit consists of a standard rod / ball mill circuit with the ball mill
    operating in closed circuit with cyclones. The rod mill was installed during the
    December quarter as part of the planned expansion programme.
    The rod mill grinding performance will be improved during the March quarter by the
    commissioning of a screen, allowing operation in closed circuit. The performance of
    the ball mill will also be improved by the use of smaller cyclones which will operate
    more efficiently than the current cyclones. Both of these installations are now almost
    complete and will be commissioned in early February.


    **************************************************


    Flotation Circuit
    The flotation circuit is made up of a combination of column cells and conventional
    float cells.
    Rougher flotation is currently being performed by column cells which are noted for
    their efficient recovery of fine particles. However, their performance is not as
    effective in recovering coarse particles and the column cells will be replaced in early
    February by conventional float cells. This is expected to result in improved flotation
    performance.
    The average flotation concentrate grade obtained during December was 23% Cu.
    Mineralogical assessment of a sample of final concentrate indicated that there were
    significant amounts of liberated pyrite and non-sulphide gangue contained within the
    concentrate. This indicates that with optimisation of flotation froth levels / reagent

    scheme and operating practices / flow configuration, the target final concentrate
    copper grade of 30% Cu is achievable.

 