Check this presentation out, page 16
http://www.asx.com.au/asxpdf/20110420/pdf/41y5gm8xpbkrpj.pdf
EER have the opportunity now to export 1mt to 3mt through Jericho on narrow gauge rail out to Gladstone.
But if you look at the presentation above - EER is going for a 20mtpa mine(Economies of scale)and building a rail spur from the Galilee rail line(standard gauge)out to Abbot point.