HHR 8.33% 0.7¢ hartshead resources nl

The first well in the Viking area, 49/17-1, was drilled in...

  1. 81 Posts.
    lightbulb Created with Sketch. 31
    The first well in the Viking area, 49/17-1, was drilled in August 1965 and discovered gas in the Viking B Field. This was followed by further exploration wells through 1973. The Viking and Vixen Fields are spread over a 24 km diameter sector in blocks 49/11d, 49/12a, 49/16a, 49/16c, 49/17a, and 49/18a in the Southern North Sea, approximately 138 km due East of Theddlethorpe on the Lincolnshire coast.
    The installations covered by this document are in the following Quad/blocks: • Viking KD 49/12a, • Viking LD 49/17a, • Viking AR 49/12a, 8 5 • Viking Bravo Hub (BA, BC, BP and BD) 49/17a, • Vixen VM 49/17a. Production from the Viking reservoirs commenced in 1972 from two manned multi jacket bridge linked complexes Viking A (Alpha) and Viking B (Bravo). Gas export from Viking A and B was combined at the Viking Riser platform (AR) prior to being exported to the Theddlethorpe Gas Terminal (TGT) via a 28” export pipeline.
    Normally Unattended Installations (NUI) were subsequently tied back to the two manned complexes as follows: • 1974 – 1975, Viking CD, DD, ED, GD, HD tied back to Viking B complex • 1975 Viking FD tied back to Viking A complex • 1984 Victor JD tied back to Viking B complex • 1995 Victor JM (subsea) tied-back to Victor JD • 1998 Viking KD and LD tied back to Viking B complex • 2000 Vixen VM (subsea) tied back to Viking B complex • 2008 Victoria SM (subsea) tied back to Viking B complex In 1991 the reservoirs produced by the Viking A complex and Viking FD satellite became uneconomic and were decommissioned in 1995.
    The Viking AR platform was r e designed as a Normally Unattended Installation (NUI) and transported export gas from the Viking B Complex to TGT until 2009. In 2009 Viking B export gas was re-routed to the Lincolnshire Offshore Gas Gathering System (LOGGS) manned Complex via a new 16” export pipeline. The 3 Viking satellites KD, LD, AR, the subsea tieback Vixen VM and the Viking Bravo Hub covered by these Decommissioning Programmes produced 1.7 Tscf of gas up to the termination of production in January 2016.

 
watchlist Created with Sketch. Add HHR (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.001(8.33%)
Mkt cap ! $18.25M
Open High Low Value Volume
0.7¢ 0.7¢ 0.7¢ $512 73.44K

Buyers (Bids)

No. Vol. Price($)
5 8594452 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 7358942 11
View Market Depth
Last trade - 10.04am 29/08/2024 (20 minute delay) ?
HHR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.