My tip on the circuit breaker required for RED is dismissal of the mining contractor. Seems possible that the plant on site is mostly high hour second line stuff, not low hour front line equipment.
It's not that difficult. You get contracts to stipulate equipment machine hours since new or rebuild. It's no secret there is no shortage of difficult to maintain high hour fleets out there.
Best way to maintain poorly performing gear is kick it off site and cop the dirruption of sourcing a more suitable fleet.
Fixing the fleet will fix the financing which will fix RED.
How they got such a poorly performing contractor
on site I hate to think.
Good luck all.
- Forums
- ASX - By Stock
- circuit breaker required
My tip on the circuit breaker required for RED is dismissal of...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RED (ASX) to my watchlist
(20min delay)
|
|||||
Last
36.0¢ |
Change
-0.010(2.70%) |
Mkt cap ! $2.448B |
Open | High | Low | Value | Volume |
37.0¢ | 37.8¢ | 36.0¢ | $9.825M | 26.88M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 1862724 | 36.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
36.5¢ | 2312588 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 84542 | 0.360 |
17 | 576790 | 0.355 |
33 | 1675872 | 0.350 |
17 | 1054440 | 0.345 |
10 | 457066 | 0.340 |
Price($) | Vol. | No. |
---|---|---|
0.370 | 255012 | 3 |
0.375 | 166314 | 2 |
0.380 | 368323 | 9 |
0.385 | 440469 | 4 |
0.390 | 334266 | 6 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
RED (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online