That is one scary story.
This bit is a worry:
"With only two of six grinding mills likely to be operating for the next two years, producing at most eight to 10mtpa, Mr Chang admitted CITIC's operating costs at Sino Iron would be high. "So long as the quantity of concentrate produced is relatively modest, the production cost per tonne during this period will naturally be high,"
- Forums
- ASX - By Stock
- GBG
- citic disaster
citic disaster, page-2
Featured News
Add GBG (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online