CLA 9.09% 1.2¢ celsius resources limited.

CLA chart, page-1618

  1. 3,874 Posts.
    lightbulb Created with Sketch. 402
    Re that comment about 8 years and 12.5c well less said the better.

    If it was 8 years I think a lot of us wouldn't be here......

    CLA's MD aka BB no doubt would have looked at places like PLS which took about 2-3 years to get to production (due august).
    He has set a similar aggressive timetable of end 2020-start 2021 for production. I'm guessing that could be feasible if PFS by say end October 2018 and a sizeable offtake partner to fund it all. I think this is a smart move, don't let it drag on, maybe try for phase 1 1.5MTPA plant , phase 2 later etc.

    We shall see with the Scoping Study (due end of this month), where we are at.

    To quote Wikipedia:

    Order of magnitude (or SS)

    Order of magnitude feasibility studies (sometimes referred to as "scoping studies") are an initial financial appraisal of an inferred mineral resource. Depending on the size of the project, an order of magnitude study may be carried out by a single individual. It will involve a preliminary mine plan, and is the basis for determining whether to proceed with an exploration program, and more detailed engineering work. Order-of-magnitude studies are developed by copying plans and factoring known costs from existing projects completed elsewhere and are accurate to within 40–50%.[1]
    Preliminary feasibility (PFS)

    Preliminary feasibility studies or "pre-feasibility studies" are more detailed than order of magnitude studies. A preliminary feasibility study is used in due diligence work, determining whether to proceed with a detailed feasibility study and as a "reality check" to determine areas within the project that require more attention. Preliminary feasibility studies are done by factoring known unit costs and by estimating gross dimensions or quantities once conceptual or preliminary engineering and mine design has been completed. Preliminary feasibility studies are completed by a small group of multi-disciplined technical individuals and have an accuracy within 20-30%.[1]
    Detailed feasibility(DFS)

    Detailed feasibility studies are the most detailed and will determine definitively whether to proceed with the project. A detailed feasibility study will be the basis for capital appropriation, and will provide the budget figures for the project. Detailed feasibility studies require a significant amount of formal engineering work, are accurate to within 10-15% and can cost between ½-1½% of the total estimated project cost.[1]


    Know this is a charts thread, sorry for that
    Last edited by blueskymine01: 04/06/18
 
watchlist Created with Sketch. Add CLA (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $29.13M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $15.16K 1.263M

Buyers (Bids)

No. Vol. Price($)
24 10584457 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 1293939 5
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
CLA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.