CLA 0.00% 1.1¢ celsius resources limited.

CLA - Cobalt related news, page-1805

  1. 6,158 Posts.
    lightbulb Created with Sketch. 764
    http://www.mining.com/glencores-congo-unit-halts-cobalt-exports-kamoto-mine/


    Glencore’s Congo unit halts cobalt exports from Kamoto mine

    Cecilia Jamasmie | about 3 hours ago |
    Katanga Mining.)
    Glencore’s subsidiary in the Democratic Republic of Congo, Katanga Mining (TSX:KAT), will temporarily halt cobalt exports from its Kamoto Project after finding high levels of uranium in the ore.

    The copper and cobalt producer said levels of the radioactive metal exceeded the acceptable limit allowed for export through major African ports.

    The suspension is expected to defer Katanga’s revenue from cobalt sales to the second half of 2019 from the fourth quarter of 2018, and the first two quarters of next year.



    Temporary suspension comes as Katanga found excessive levels of uranium in the Congo mine's ore.
    The company noted it would build an ion exchange system to remove uranium, which is expected to cost about $25 million and be ready by the end of the second quarter. In the meantime, it’ll stockpile the vital battery ingredient while continuing to mine both cobalt and copper.

    Shares in Katanga fell as much as 33 percent in Toronto to the lowest since May 2017, while Glencore's dropped almost 2.9 percent in London by closing time.

    Katanga's assets include the Kamoto underground mine and KOV open-pit mine, providing sulfide and oxide ores respectively. It also owns the Kamoto concentrator and Luilu metallurgical plant for the onsite production of refined copper and cobalt.

    The decision of halting exports comes almost a year after Katanga resumed processing of copper and cobalt, which had been suspended since Sep. 2015,  during the construction phases of the ore leach project.

    Katanga contributed 102,600 mt of copper and 6,500 mt of cobalt to Glencore's nine-months 2018 production totals.

    For the full year 2018, the Swiss miner and commodities traders expected to produce 39,000 mt of cobalt, plus/minus 2,000 mt, and 1.465 million mt of copper, plus/minus 20,000 mt), with Katanga expected to contribute around 11,000 mt of cobalt and 150,000 mt of copper.
 
watchlist Created with Sketch. Add CLA (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $28.28M
Open High Low Value Volume
1.1¢ 1.1¢ 1.1¢ $35.98K 3.270M

Buyers (Bids)

No. Vol. Price($)
15 6509000 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 300000 2
View Market Depth
Last trade - 10.48am 14/11/2024 (20 minute delay) ?
CLA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.