The Operator plans to run a
second intermediary casing string once the well is drilled down to approximately 3,200 ft, setting the second
casing string above the primary C18 and C19 carbonate reservoirs.
From the Feb 20 update
Oilman will this casing be cemented into place like the first casing, if so then drilling would stop for a few days to a week,this would be a good time to test and report c13 through to c17.
Would like your thoughts, cheers.
- Forums
- ASX - By Stock
- ETR
- clarification from management re ann.
clarification from management re ann., page-11
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable