They said 7-10 days, I think about right. I never been to a mining site to see taling damn but cutting pit is much smaller. Not much dirt or water to be disposed like mining.
- Forums
- ASX - By Stock
- clarification from management re ann.
They said 7-10 days, I think about right. I never been to a...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
TLX
Telix jumps 11.6% as US government indicates proposed medicare changes won't affect prostate cancer drug
ETR (ASX) Chart |
Day chart unavailable