Stage 2 is about more than the 20%odd which is currently indicated.
The converting of the indicated resource will also allow the opening up of the northern part of hardstaff which is already fully drilled to inferred. The pit size will hopefully look like the bottom picture. I'm expecting a 120% increase to the reserve. Then we add Isthmus.
The resource size proir to declaring a reserve size was 490Mt Indicated and 57Mt ( inferred not allowed) Because of some technicality the positionoing of the unallowable inferred tonnage impacted on the indicated resource, so from a indicated resource of 490Mt PLV could only declare a reserve of 143Mt