it's a good pick up that the equipment and installation costs to turn the solar energy into energy that can be transferred to the grid or stored in a battery will need to be accounted for. I assume when CPV say that 87% payback in 8 years they mean that's the payback for the glass not all of the infrastructure costs to actually do something with the energy that is captured.
obviously each business case will need to take that into account and do their dure diligence.
- Forums
- ASX - By Stock
- ClearVue discussion
it's a good pick up that the equipment and installation costs to...
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPV (ASX) to my watchlist
(20min delay)
|
|||||
Last
48.0¢ |
Change
-0.010(2.04%) |
Mkt cap ! $116.2M |
Open | High | Low | Value | Volume |
48.5¢ | 49.0¢ | 48.0¢ | $46.46K | 96.40K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 25263 | 47.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
48.0¢ | 27633 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 25263 | 0.475 |
1 | 63829 | 0.470 |
3 | 9062 | 0.460 |
5 | 53259 | 0.450 |
1 | 4494 | 0.445 |
Price($) | Vol. | No. |
---|---|---|
0.480 | 27633 | 2 |
0.490 | 24034 | 6 |
0.495 | 29854 | 3 |
0.500 | 114228 | 2 |
0.505 | 63928 | 3 |
Last trade - 16.10pm 07/06/2024 (20 minute delay) ? |
|
|||||
Last
48.0¢ |
  |
Change
-0.010 ( 1.03 %) |
|||
Open | High | Low | Volume | ||
49.0¢ | 49.0¢ | 48.0¢ | 11783 | ||
Last updated 14.44pm 07/06/2024 ? |
Featured News
CPV (ASX) Chart |