"The crashcould affect port operations for months, officials say."
I bet the port is back in operation within a month they only need to take out the debris from one span of the bridge to get port access . Should be plenty of salvage barge cranes on the Eastern Seaboard that could be there within a week
Probably be years before the bridge is back in operation though .
- Forums
- Breaking News
- Clif High: Baltimore Bridge Attack - Solar Eclipse April 8th - Cyber Attacks
Clif High: Baltimore Bridge Attack - Solar Eclipse April 8th - Cyber Attacks, page-14
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online