Clif High: Baltimore Bridge Attack - Solar Eclipse April 8th - Cyber Attacks, page-14

  1. 33,246 Posts.
    lightbulb Created with Sketch. 1681
    "The crashcould affect port operations for months, officials say."

    I bet the port is back in operation within a month they only need to take out the debris from one span of the bridge to get port access . Should be plenty of salvage barge cranes on the Eastern Seaboard that could be there within a week

    Probably be years before the bridge is back in operation though .
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.