Thanks for the link. As I posted previously, this is all about poor management and execution. Nothing else.
" incompetent managers "
" Back in April we raised significant issues about the quality of the load testing and capacity of the replacement systems at Owen Springs "
" It would also appear that the correct generators were not online at the time, which is a mandatory requirement from PowerWater System Control in Darwin. Previously, this would have gone through the checks and balances of the Senior Generation Operators at Ron Goodin "
Let me guess. The managers were most likely engineers.
- Forums
- Science & Medicine
- Climate scientist running the power grid
Thanks for the link. As I posted previously, this is all about...
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)