CBD 0.00% 1.1¢ cbd energy limited

bvw1705 I remember seeing some of this in prospectus etc. so i...

  1. 145 Posts.
    bvw1705
    I remember seeing some of this in prospectus etc. so i went back and found a few snippets.
    this is from 2008 report-
    Completion of building the proto-type energy storage heat block, including the commissioning and completion of
    engineering design work associated with its construction, including its acceptance testing for inclusion of this
    technology within the King Island project.

    http://www.cbdenergy.com.au/pdfs/CBD%20Annual%20Report%202008%20FINAL%20web.pdf

    page4 Commissioning means its working (ON)

    Prospectus 2009
    http://www.cbdenergy.com.au/pdfs/CBD_Prospectus_2009.pdf

    page16 &
    page 12 have pictures of these 2 electrical items-

    King Island - Resistive Frequency Control Unit
    This unit was designed and constructed by CBD subsidiary
    Remote Area Power Systems to enable significant reductions
    in diesel usage by enabling a greater proportion of wind
    power to be utilised

    &
    CBD Energy - Large Scale
    Energy Storage Module
    Each module stores many MWh�s
    of electrical or thermal energy
    using the patented technology
    developed by CBD Energy. This
    is the first of the production
    modules planned
    for King Island.

    There was also an article indicating an expansion of project.

    This is also a local (TAS) story on island-

    http://www.themercury.com.au/article/2010/12/09/191951_tasmania-news.html

    I thought the initial stages of this were all finished. A good question for annual general meeting.


 
watchlist Created with Sketch. Add CBD (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.