Most of the drilling done was shallow - about 1500-1800m or so was planned - they hit water in some holes and proposed to switch to DD (with their very own drill rig!!). They also planned some deep drilling to 500m but this has never neen heard of again. By Sept 2010 - Morris Ck was no longer on their list of priority drill targets.
- Forums
- ASX - By Stock
- cloncurry - uranium belt of queensland
Most of the drilling done was shallow - about 1500-1800m or so...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)