Originally posted by jimone
↑
The are expecting the cyanide licence to be granted by the end of the month, not holding my breath on that one, but at any rate it should not be to far away. They have stated that when the licence is granted they will be able to use cyanide at the tail end of the plant. If this is there thinking they might wait until they have cyanide tanks, CIL or what ever the plan is place before running the tailings.. Just to make sure we get all the gold, after all we do not want to have to process it a third time..
Here is a question for those that know, if, when, they incorporate cyanide, will they be able to run the silver material, from memory cyanide will pick up the silver as well as the gold. Drill hole CDP 021 was reported with ~ 20 meters at ~1300 gt of silver and is almost directly under where they are mining at the moment. If this is a 20 square meter block, that is around 800 k oz of silver, ~ 16 million AUD ready to go, is that an option or not ??
The second under ground loader was expected by the middle of the month also,, so that should be on site any day now also to help bolster production..
Expand
Good point re strong Ag values in CDP 021.Perhaps this was anomalous,but may be a more extensive argeniferous lode.
This may be why the on-site lab commissioning is associated with the cyanide part of the process, so as to separate the streams as Ag vs Au comes thru.
Don't know,but perhaps some who does can enlighten us.