The maiden resource must just be for Kebigada? Not for Douze Match or the other areas that were also drilled? Or will all holes that have been drilled over the entire project be included in the initial estimate?
Perhaps I should take a mulligan...?
- Forums
- ASX - By Stock
- Closest to the pin - maiden resource
The maiden resource must just be for Kebigada? Not for Douze...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ANL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.74M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ANL (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online