CNB 0.00% 40.0¢ carnaby resources limited

CNB Summary and Why Its So Undervalued, page-3527

  1. 610 Posts.
    lightbulb Created with Sketch. 84
    Hey all, hope everyone is having a good weekend. Just going over my notes on Strelly and wanting to make sure my numbers on phase 1 drilling are correct.

    As per December 14 announcement: 372 AC holes and 26 RC holes completed which was stage 1. Results in this announcement were for 113 AC holes (88 at Palisade) and 0 RC holes. The majority of these were for Palisade (which is my primary area of interest) and sized the gold anomaly at 1 km x 300 m.

    As per January 27 announcement: 26 AC holes and 10 RC holes reported (6 AC and 2 RC at Palisade). The anomaly grew to 4 km albeit based on wide spacings in both the NE and SW directions.

    Outstanding phase 1 results: 372-113-26 = 139 AC, 26-10 = 16 RC.

    Looks like most of the outstanding results are for the NE and infill so will be looking for that Palisade Corridor extension which is currently 4 km and to confirm continuity in the length.

    These numbers look correct-ish? I suppose an announcement will come very soon with these results together with details of phase 2 drilling.
 
watchlist Created with Sketch. Add CNB (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.