FAR 2.04% 50.0¢ far limited

H I hope you are right on the SNE results being "as expected" or...

  1. 1,721 Posts.
    lightbulb Created with Sketch. 594
    H
    I hope you are right on the SNE results being "as expected" or hopefully "better than expected". I have been watching Marine traffic over the past week or so and have noticed ( based on previous advice from JP re where positions of support vessels should be when flow testing) that the support vessels have only been grouped in the "drill testing"formation for only a few days at most. At present only one support vessel is nearby Athena whilst other two are in or near Dakar port. I guess my question is, is a few days enough time to do a good flow test on a solidly producing well. Hopefully it is?? Anyway the Athena has still not left the SNE 3 site so perhaps more testing to follow?

    Perhaps others with more experience in this area may want to add their two bobs worth??
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.