The above sounds a lot like Future Element/CleanTeq.
Especially this part:
Then the second aspect to this is the current arising sort of the current tailings we're producing and the tailings that are in the tailings dam. So what we've done there as well over the last 6 months or so is we've designed a process where we can take these tailings, regrind them and get about 60% to 70% recovery on that feed to the new plant. That's a greenfield stand-alone plant. And that's effectively taking recovery to the 95%. We believe there's about 30,000 tonnes per annum in those current arisings plus what's in the dam and then some additional recovery from the modifications to the existing plant. All on track, probably April is we'll have some basic engineering, we'll have a cost budget estimate, we'll get approval, and we'll fast track this as soon as we can.
- Forums
- ASX - By Stock
- CNQ
- CNQ General Discussion
CNQ General Discussion, page-250
-
-
- There are more pages in this discussion • 122 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CNQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
35.5¢ |
Change
0.015(4.41%) |
Mkt cap ! $25.64M |
Open | High | Low | Value | Volume |
35.5¢ | 35.5¢ | 35.5¢ | $3.562K | 10.03K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 23231 | 34.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.5¢ | 21519 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 23231 | 0.340 |
2 | 38787 | 0.335 |
2 | 21928 | 0.320 |
1 | 80 | 0.315 |
1 | 988 | 0.310 |
Price($) | Vol. | No. |
---|---|---|
0.355 | 21519 | 1 |
0.380 | 20000 | 1 |
0.385 | 10000 | 1 |
0.390 | 653433 | 1 |
0.400 | 10060 | 4 |
Last trade - 14.15pm 07/10/2024 (20 minute delay) ? |
Featured News
CNQ (ASX) Chart |