X64 0.00% 57.0¢ ten sixty four limited

CpDLC,"• L8 shaft (formerly the Saga shaft) production reduced...

  1. 42,601 Posts.
    lightbulb Created with Sketch. 1024
    CpDLC,

    "• L8 shaft (formerly the Saga shaft) production reduced during June quarter as a result of
    narrower veins than expected near the shaf"

    The above from the operational report is what worries me. Is this code speak for lower grade and/or lower tonnage for the mill therefore lower production?

    I noticed that MML SP was collapsing as soon as it opened on Monday and the company strategically placed the operational update at the close of business that day. I could also read that the gold price had quite a fall on last friday but was already moving back up on monday. I don't want to read consipracy but after Newcrest analyst fiasco anything is possible.

    I hope they are not slipping up on production because of grade and/or geology because anymore bad updates and this this stock may fall to next support of 89C.
 
watchlist Created with Sketch. Add X64 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.