Coalition nuclear plan would force consumers to wait 20 years longer for 30% higher electricity bills, page-4

  1. 28,091 Posts.
    lightbulb Created with Sketch. 1368
    Except WA is not linked to the East Coast grid that's where the bulk of the gas is produced.

    The one potential alternative use for the excess power created by nuclear is hydrogen/ ammonia production. That would be the only way to get close to being viable.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.