Add in the fact that on a SIL 4 rated system, the testing and...

  1. 7,037 Posts.
    lightbulb Created with Sketch. 166
    Add in the fact that on a SIL 4 rated system, the testing and commissioning cannot be done by the team that designed and built it. They must be independent.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.