"The coal processing plant consists of two identical 1,500tph modules which have been designed
for an average 55% yield on 20.4Mtpa ROM production utilizing 6,800 actual operating hours or at
78% net effective utilization."
This has been increased to 12 mill p/a since the BFS due to increased effective utilization to 83.6%
Add to My Watchlist
What is My Watchlist?