Valinvestor
Correct. 1.2 bill capex to produce 12 mil saleable. However, approx $430 mil is set aside to purchase own mining equipment including two draglines at $124 mill a piece and there is $102 mill to build own load out on CN main rail line which could ultimately load over 20 mill tonne pa. Capex will build infrastructure capable of dealing with increased tonnages from Vista Extension and Vista South. Draglines allow low mining costs. Mine gate cash costs of C$27.3/t in the initial 10 years of production and C$34.4/t over life of mine average free-on-board cash costs of C$61.0/t in the initial 10 years of production and C$68.1/t over life of mine. At .94 USD/CAD it is more economical that most Australian mines. Capex is for min 28 year mine life. All in all not that excessive.
Regards
Danash
- Forums
- ASX - By Stock
- coalspur projects
ValinvestorCorrect. 1.2 bill capex to produce 12 mil saleable....
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPL (ASX) to my watchlist
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.33M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online