the blackwater rail network to gladstone is expected to be...

  1. 641 Posts.
    the blackwater rail network to gladstone is expected to be operational on 21 jan 2011. the road to blackwater opened (at duaringa) this morning from gladstone . at least 30 b doubles of nh4cl mmoved past our back road this afternoon heading to blackwater etc but funnily no b doubles of diesel normally 30 to 40 per day is needed in the blackwater area
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.