If we assume the Colt factory in osceola is going to manufacture MAUL, then the article I posted provides a timeline for when this will start; manufacturing will ramp up in June. We're therefore about 2 months away before MAUL goes into production. As indicated in a previous post, Colt is likely to be one of the parties MST is in talk with to secure financing.
- Forums
- ASX - By Stock
- colt to open factory in osceola county
If we assume the Colt factory in osceola is going to manufacture...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)