If the ML doesn't drop by Aug 15 I think it's time for NF to give us some details as to why it's taking so long for this issue to be sorted. AVZ itself said ,“We regret that the period of voluntary suspension has lasted longer than was initially intended." If it's a legal issue and must remain confidential , then say it . If it's a schedule problem ("herding cats ") , then say it . Not going to affect the SP . We are in suspension . Or does Nigel think we are so close now an explanation is not necessary . .
- Forums
- ASX - By Stock
- AVZ
- COMINIERE SA denies USD 70 million advance by AVZ as cost of feasibility study for Manono Lithium project
COMINIERE SA denies USD 70 million advance by AVZ as cost of feasibility study for Manono Lithium project, page-45
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)