CFU 0.00% 0.4¢ ceramic fuel cells limited

student housing.how water out of the pipe, electricity out the...

  1. 330 Posts.
    student housing.

    how water out of the pipe, electricity out the wire and noodles cooking on the top.

    lol

    thanks for the data.

    Costs are not too high - solar is around 10-15k per kw - if this is 15-22k for 1.7kW compares well with wind ($4 per kw) at much higher utlisations.

    Thx

    f111



 
watchlist Created with Sketch. Add CFU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.