Good post Lest,
From my research condensate has to be removed before the gas can be connected to the grid.
GGP have to maintain sufficient pressure in the well to avoid the dew point being reached where the condensate liquefies in the well bore and causes a possible condensate blockage and restricts the flow of gas.
FWIW