"BRM TPI Rail Corridor Access Application Section 91s submitted to Department of Regional Development and Lands Environmental field surveys to commence by March 2010 BRM Rail Infrastructure Engineering Detailed engineering studies have commenced for rail design on the Marillana Site NWIOA Desktop Studies for RAIL optionality 4 options considered including spur to TPI and/or stand alone line(s)"
Is the 2nd point on "detailed engineering studies have commenced for rail design on the Marillana site" new ?
BRM Price at posting:
$3.84 Sentiment: Buy Disclosure: Held