-
Share
242 Posts.
42
06/05/10
11:26
Share
I'm afraid you're wrong on all accounts there buddy
NO WHERE in NZ will you have 2.5bn tonnes in reserves
PRC has a maximum exploration potential of <60Mt
CAPEX of BTU is much lower due to Open Cut strip mining.
UG Hydro Mining also means PRC will have a lower recovery rate than BTU.
In all likelihood BTU will hit their production milestone much sooner.
Also you cannot say 7-10 years is uneconomical to run without a basic understanding of the economics of the mine
Premium Coking Coal, low CAPEX/OPEX, 1Mtpa, this is a cash machine with a very short payback and high IRR
-