Actually it's probably unlikely that FBR is compatible with internal walls made of timber or steel frames. These days most frames are made in factories - if they are put up first then Hadrian can't reach the walls on the far side, if Hadrian builds the external walls first then it probably becomes impossible to deliver the prefab frames.
So Hadrian at a minimum must build the interior walls.
I think there is scope for some of these competitors to work in conjuction with hadrian - eg to access difficult spots, or lay the first course on uneven foundations - but that is for the future.
Right now FBR has got to get going. Fast.
- Forums
- ASX - By Stock
- FBR
- Competition
Competition, page-38
- There are more pages in this discussion • 331 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $111.0M |
Open | High | Low | Value | Volume |
2.4¢ | 2.5¢ | 2.4¢ | $104.8K | 4.309M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 237136 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.5¢ | 4812458 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 237136 | 0.024 |
15 | 5182604 | 0.023 |
24 | 3330736 | 0.022 |
9 | 4501871 | 0.021 |
17 | 4849746 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 4812458 | 13 |
0.026 | 6390810 | 21 |
0.027 | 3044856 | 10 |
0.028 | 5332399 | 9 |
0.030 | 465775 | 6 |
Last trade - 15.46pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
2.5¢ |
  |
Change
0.000 ( 4.17 %) |
|||
Open | High | Low | Volume | ||
2.4¢ | 2.5¢ | 2.4¢ | 969217 | ||
Last updated 15.32pm 17/06/2024 ? |
Featured News
FBR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online