KAR 4.92% $1.92 karoon energy ltd

completion brine affects well flow

  1. 1,325 Posts.
    The montara sands appear to be gas charged ,during the drilling, heavier mud was required to suppress the hc flow causing a blowout to the rig which is what the bops are their for if the pressure over comes the mud weight then an explosive expansion can happen .

    so it looks as though the dst communication with the well bore in montara does seem technical .lack of the correct equipment ie poor planning seems the go.

    The low flow from the b plover does seem as though considering that they had the core samples does seem to be from the brine restricting the flow and that more time was required to eradicate the brine to achieve a higher flow rate .

    this is an extract from a recent study .

    Gas wells in tight reservoirs have shown low gas deliverability after drilling and completion operations. This is partially attributed to penetration of completion fluids into the near the wellbore. This increase of liquid saturation into the reservoir can play a significant role in the blocking of tight rock due to high capillary forces and vapor pressure. The scope of this study was to investigate the impact of completion fluids on gas productivity in carbonate and sandstone reservoirs, and to evaluate feasibility of using various solvents to remove and/or minimize liquid blocking effects. In this study, extensive coreflood experiments were conducted on carbonate and sandstone cores recovered from gas reservoirs in Saudi Arabia to assess the loss in gas relative permeability caused by several fluids used as completion fluids. Alcohols were also evaluated as solvents to remove or minimize water blockage. Interfacial tension of fluids was measured using the pendent drop method at reservoir conditions. Experimental results showed that the used completion fluids (brines, KCl, alcoholic brines, and diesel) caused a severe reduction in gas productivity. The clean-up of these fluids was found to be a very slow process and is a function of capillary forces. Neat diesel caused a decline in the gas productivity index (PI) more than brine because it has a lower mobility. The solvents used were effective in displacing the completion fluids studied and consequently restoring gas productivity. Mixing brine with alcohol speedup the cleanup of trapped liquids.

    please note that the brine caused a severe reduction in the flow rate ,food for thought as to the potential of what p2 may have flowed if the completion brine was not their .

 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
(20min delay)
Last
$1.92
Change
0.090(4.92%)
Mkt cap ! $1.539B
Open High Low Value Volume
$1.86 $1.92 $1.85 $18.66M 9.832M

Buyers (Bids)

No. Vol. Price($)
4 11055 $1.91
 

Sellers (Offers)

Price($) Vol. No.
$1.92 144289 16
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
KAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.