I'm not sure that I agree. I believe we are releasing results for the southern extension (which are fair to be below average) first before moving either to the western extension holes or direct strike area, followed then by the in-fill drilling.
I also note two planned holes for a northern extension ("Noted as R") which i don't believe have been discussed yet.
As much as we do have 3 drill rigs on site, I think results every 2 weeks is fair and anything more frequent is a bonus. Patience is a virtue
Also quite happy to see POG bounced perfectly of $1200 and up to $1219.93 as I type this.
CDV Price at posting:
19.5¢ Sentiment: Buy Disclosure: Held